Headquartered in Japan, Leapton Energy is a global leader in the solar PV industry, specializing in Tier-1 solar modules, battery energy storage systems (BESS), and inverters. With over 10 years of experience, Leapton Energy’s products are now available in more than 70 countries worldwide.
Leapton’s solar modules come with up to 30 years of warranty, ensuring long-term reliability. Its energy storage systems cover both high-voltage and low-voltage solutions, ranging from 2.56kWh to 240kWh, suitable for residential, commercial, and industrial applications. The inverter series, including on-grid and hybrid models, is mainly designed for residential systems, providing high efficiency and stability. By integrating PV modules, storage, and inverters, Leapton Energy delivers smart and reliable clean energy solutions worldwide.
MW
+MILLION
+COUNTRIES
+FROM
The headquarter - LEAPTON ENERGY CO.,LTD is founded in Kobe, Japan in 2012. It is not only focusing on R&D and sales of the solar power system, solar modules, mounting system and ground screw in Japan, but also focusing on the development, management and after-maintenance of the solar power station. We have built more than 60 own solar power stations all over Japan relying on our own resources. In 2015, a branch was established in Tokyo, which is focusing on the sales of solar pv products.
In 2012, Leapton establish China headquarter in Shanghai - LEAPTON ENGINEERING TECHNOLOGY(SHANGHAI) CO.,LTD, which focus on Chinese PV System development and sales.
The module factory - LEAPTON SOLAR(Changshu) CO.,LTD is established in Changshu, Jiangsu in 2017, which is focusing on the production and sales of the solar modules all over the world. With the most advanced automated production line in the world, the module annual capacity was 600MW in 2020. The products are strictly manufactured according to the Japanese industry standard, which is one of the top ten Japanese module brands and ranked in the Bloomberg Tier1 list for many consecutive years, .In 2019, the project will be divided into two phases, covering a total area of 72,000 sqm. By the beginning of 2021, the first phase of the 2GW plant has been completed and Leapton solar enter the GW era. The second phase of 3GW plant will be completed in 2023.
Supported by famous Japanese banks
Tokyo, Japan
Kobe, Japan
Changshu, China
Shanghai, China
Rotterdam, Netherlands